Approved Standard
Power industry distribution cable jointer
Connect new supplies, divert and make alterations to existing supplies, and locate and repair faults on the underground power distribution network.
- Level
- 3
- Reference
- ST1332
- Sector
- Engineering and manufacturing
- Typical duration
- 30 months
- Approved for delivery
- 30 November 2023
- Maximum funding
- £27,000.00
- Trailblazer contact
-
engineering.manufacturing@education.gov.uk
- External quality assurance (EQA) provider
- Ofqual
Full information on Power industry distribution cable jointer
Source: Institute for Apprenticeships and Technical Education
Standard version details
The version may be estimated where records did not previously exist.
| Version | Active apprentices | Active EPAOs | Completed assessments |
|---|---|---|---|
| 1.1 | 91 | 1 | 0 |
| 1.0 | 14 | 0 | 0 |
| 0 |
End-point assessment organisations
| Regions | EPAOs in region | Active apprentices | Completed assessments |
|---|---|---|---|
| 1 | 0 | 0 | |
| 1 | 28 | 0 | |
| 1 | 3 | 0 | |
| 1 | 1 | 0 | |
| 1 | 45 | 0 | |
| 1 | 11 | 0 | |
| 1 | 0 | 0 | |
| 1 | 17 | 0 | |
| 1 | 0 | 0 | |
| 105 | 0 |